Restoration of bathtubs with their hands
Three effective ways of restoration bath at home.
- Processing two-component enamel;
- Application stakril;
- Implementation of the new baths in the old one.
Regardless of which method you choose, the preparatory phase for all of them will be the same. Let us consider it in more detail.
Training. Step 1.
Remove the old (dirty) layer baths using a cleaning agent containing abrasive particles and a rigid brush.
Training. Step 2.
Without washing the abrasive material are passed over the bath with fine sandpaper. Together with abrasive sandpaper must remove the layer with impurities soak.
Training. Step 3.
Now abundantly washed off with warm water all lather, abrasive particles and the removed contamination of the bath surface with sandpaper. Wait until runoff across vody (10-15 min.) And pour bath of oxalic acid and after 2-3 minutes sprinkle soda. Oxalic acid soaked enter into neutralizing reaction with soda and "squeeze" the fine dirt from the bath.
Training. Step 4.
Fully typed hot water bath and descends after 10 minutes. Dry the bath cloth or hair dryer building.
Training. Step 5.
Finally the skins bath fine sandpaper, remove dust with a vacuum cleaner, degreasing bath of alcohol (do not take into early!)
Training. Step 6.
Disassemble the hose from the shower, disconnect the siphon and drain grate. Under the hole below the bath put a mountain of rags and go to the restoration.
Processing two-component enamel
Mix purchased in advance enamel and hardener mixer, a paint roller or brush paint the bath: first horizontally and then vertically. Apply immediately three layers of enamel, stretching smudges. After 5 days the bath is ready for use.
Application stakril
Blender bought stakril mix, pour the mixture into a smaller container and pour it on top of the bath to drain the entire perimeter, since the bath center. After that, repeat step for creating a second layer stakril mixed, it will leave a surplus through the drain hole in the cloth. Dries stakril 5 days.
Implementation of the new baths in the old
In specialty stores or shops try to find ready-made acrylic liner for your bath model, remove the drain grilles in the bottom and in the side of the bath, apply a sealant on the surface of the bath foam and put a new bathroom in the old, carefully distributing load. 23 hours bath is ready for use.
Hopefully, tips were useful to you, and you subscribe to my RSS feed!