Drovennik for a bath with his hands for 6000 rubles. Total views
After installation of shingles covered the inside of the drovennika alkyd azure for a tree:
Result. Immediately after the snow began to fall.
Purchased, as usual, a proven brand blue: Elan from the Alps. Color Oregon. 1004 rubles., 2.3 liters. I took color in darker as Different shades of boards.
Guarantee that the board over time, not turn black. And when drovennik will be half empty, remain presentable
Lazur made a trial to paint the bottom of the column, which is lined with a pad washed concrete. No gloss, but the effect of wet stone is present. I see how the coating will survive the winter. If would be stable, it is possible to bear in mind as an alternative to polyurethane lacquer or varnish on the stone.
After the end of painting, just a half an hour a couple of centimeters of snow fell, which is thought to melt. A work-related drovennikom are not finished yet.
Beforehand acquired profile galvanized plasterboard maximum thickness: 3m 28h27h0,65 - 2 pieces. (235 rubles.). It will be fixed to the concrete footings. And it will build decorative tiles to surface "Washed concrete."
The profile exhibited by level, placing a trim shingles, fixed on dowels previously drilled hole puncher. Whatever profile is not slack in several places recorded it on hangers for mounting profile drywall.
The first set of tiles lining the cap drovennika. The lower part of the tile rests on and is fixed on the metal profile (into it with little effort). But I do not like the kind of fixing segments of the profile bars at the top part thereof. I decided to dismantle them and do things differently.
On top of a fixed tile screws. In the spring I will type the plinth of concrete decorated with pebbles, and will hide the screws.
Fixed tiles on both sides drovennika. Section height - 25 cm. Here clipped grinder only one tile on each side.
On the upper side drovennika tiles had to cut to a height of 16 cm. Fortunately, I did not yet took great grinders:
I finished. If pushed to work a couple of days ago, it had to be snow. Yes, it was not comfortable to work with. Autumn stood great for building dry. Weather and so you need to say thank you!
When it began to get dark - finished stack firewood drovennik. Entered not all. Only a few bundles of wood fines and pile (trimming of the boards and beams, and chips).
So, how much I spent on drovennik:
- foundations (concrete poles): 500 rubles.
- timber: without cost. Because used b / y, from the formwork. But I have this new volume of the boards (26 pcs. 25h150h3m) in 2017. acquired in 2000 rubles. Bruce stayed with the construction of baths. It can be replaced on the same board thickness of 25-50 mm
- Profile for plasterboard: 235 rub.
- shingles: 2 packs (6? 2) - 1860 RUB.
- blue wood: 1000 rubles.
- decorative tiles: their own production, ie almost free.
Total: 5595 rubles. Plus petrol to travel. It turns a little more than 6000 rubles. Although in reality, I spent about 3.5 thousand. B / y timber could go and on the wood of the unsuitability for other needs because of their condition (was covered in concrete).
IN this I brought the material cost of such drovennika without foundation. Price of purchase: 14 thousand. rub.
Previous parts:
Drovennik for a bath with his hands. Pouring the foundation for 500 rubles
Drovennik for a bath with his hands. Installation of floor and frame
Drovennik for a bath with his hands. Installation of flexible roof
photos of the author (s)
Subscribe per channel, introducing it in the browser bookmarks. There is a lot of interesting information.