Fence of the decorative blocks, and metalloshtaketnika. The results of the work in the middle of July 2019
Building a fence is slowly but progressing. Due to the independent production units around this pace of work and counted. Long, but beautiful and exclusive. Moreover, at a cost comparable to conventional PGS-blocks.
So, what has been done in the last week? I reached the point where the beam must be mounted from the metal pipe to metalloshtaketnika. I bought them at the end of June. I decided to paint them immediately:
At the beginning of degrease - rubbed oil factory and a local rust.
Steel pipes shiny, without local corroded areas. Three tubes remained with 2017. - grinder scraped from the wire nozzle with their thick rust and they have good as new.
Veils primer enamel in 1 to 3 rust TM Lakra banking 1.7 kg chocolate brown color.
In 2017 acquired for coating pipes priming enamel TM Sayver.
Lakra seemed to apply much better - high hiding power, it is not necessary to pass several times a brush. This is not surprising, the price is above the banks. Moreover, Lakra - the average price segment. After drying appeared glossy appearance. At TM Sayver this gloss there.
So, in the opinion of the expert lacquers, although these brands do not have a relationship.
On the coloring it took almost half of the day. It was a sunny hot weather - the pipe dry for a few hours to the extent that you can take them with his hands.
The fence has decided not to make mortgages and then fasten them to the bar, and immediately fix these prozhiliny.
Fixed direct hangers for mounting of steel structures for drywall screws for metal 4,2h13mm. Inside the pillars composing the pipe still are locked concrete.
Decorative covers on the blocks yet - they will be installed after the pole before installation metalloshtaketnika.
Mounting could not even do that. But so peaceful. It ensures that no intruders are not squeeze the tube with metalloshtaketnikom of the pillars.
A disk grinder stone sawed grooves in blocks of pipe and simply put these blocks on pillars - without solution. Later I will set both horizontally and vertically, and the inside seams zamazhu zalyu concrete.
As filling continues to blocks composing pillars. It remains to produce 15 blocks. Finals closely.