How to connect the boiler scheme
Description skeletal scheme, which shows the basic principles of the boiler connection
Before the boiler to the water, you need to install a fine mechanical filter. before filter set the shut-off valveSo that we can monitor the system.
After the filter we go teesWhich supply cold water faucets in bathroom, kitchen and other consumers.
After the tee before the boiler is installed another shut-off valve. After the shut-off valve should go disruptive valve after him teeMounted on the cold water pipe boiler. On the tee set B draining tap water.
Thus, a system of draining water from the water heater for his service.
Principle of operation
Cold water is supplied to a boiler and heated by a heater (tubular electric heater). Then, rushes through the hot water outlet pipe itself Truk located at the highest point of the boiler. The hot water is distributed to the mixers.
At the output of hot water is installed tee bleed screw or ordinary ball valve. To be able to cut off the water seal in a hot water supply pipe when discharging water from the boiler.
Procedure for draining water
We Cover the stopcock to the boiler, open valve B, then the tap A and the water is drained.
This can be used to produce technical water for domestic purposes, if blocked the water supply in case of breakage.
The main thing is not to forget, then fill the boiler, so as not burnt heater.
Do not forget to subscribe!
Break flexibles mixer on how to avoid breaking
Flows gander - repair mixer
Flowing shower hose - Repair in 5 minutes