Country sauna 70 000
In the second half of May Day 2019 I have been on a small home. Made structure pictures, baths, to the process of construction which have the attitude.
So, I had a bath from a bar, built 35 years ago. While cement and concrete were not as available in the village. Yes, and waterproofing technologies, few of the builders had no idea. Built as well as build their grandfathers.
Log buildings baths lay on the ground, the water did not drain. Therefore, even the first crown of larch (and above him) - rotted. The bath was dismantled and constructed from more or less the entire bath timber side. Plus another small frame (omshanik) - all under one roof. In the second blockhouse planned wintering bees in the hive:
Between the bath and omshanikom - pantry. In addition to timber, slate is also used from the old structure. But he was not 35 years old - he is younger. The selected timber's quality such as:
Bottom row log - deciduous and again lies almost on the ground, rather than on hardwood poles. No foundation. Concrete foundation for rural Siberian backwoods - a luxury. Gravel, cement, reinforcement is necessary to drive a hundred kilometers or more. A timber is always there in the village. Someone, yes saws.
The phrase "at our age is enough" - an argument for the villagers. Most importantly - economically. It's not my judgment. It is a given.
In general, the construction team carefully dismantled the old bath, chose not rotten timber and folded out of it a new structure.
Of works made by builders, has been:
- septic tank of b / y tires. construction leads here
- concrete bowl drain water under floors in a septic tank through a plastic sewer pipe
- hardwood floor boards
- overlap with bombarded earthen ground for warmth.
Next, it was necessary to pour the slab under the stove, to produce and supply the oven, insert the door to do the electrics and interior and exterior decoration. It did everything together with his brother, when he came to the village. Does not often happen, because distance of 320 km from Krasnoyarsk.
Brother as having experience in welding, two days cooked just such a furnace:
It is made of two discs of KrAZ. The top was of an old, old furnace. But the bottom, the old bankrupt, and from the new drive made a new furnace (welded neck for laying wood):
The water tank is welded to the furnace, but has a dual board from the furnace - the water is never boils. Rather boiling locally at the points of contact with the stove. Because of this, there is increased erosion. Ideally, you want to insert here a tank made of stainless steel.
The metal furnace based design, welded from the corner of the old Premium tubular bed. But it is not - the brickwork. Thus addressed the issue of fire safety - the passage of the pipe through the hardwood floors. Brick does not heat the wood to its ignition.
Oven on a concrete slab. Draining water into a cup under the floor, and then - in the septic tank.
On the roof of the brick chimney should iron pipe with cover, protected from rainfall.
Brickwork laid a second time. For the first time in his bath. The bricks were of old stock. Do not buy.
In the dressing room the place is small. It does not wash. Bath made without it. Construction of log houses commanded me. Perhaps it would have done differently.
Inner trim produced in the next arrival of the dry board prostrugannoy 25h150 mm. For interior decoration takes her to a local carpenter who had a machine. Prostrugal chamfered.
I made a small canopy and benches
Doors purchased from a local carpenter.
In summer produce external finish planed board - nailed "ladder". Looks interesting and are not visible gap, since the board will shrink.
Brother decided to complicate the design and made a small terrace to relax. The facade is covered with frosting alkyd for wood - pine color. Some inexpensive construction of the village shop.
Strongly criticize because during the construction of baths pursued one goal - to make as cheaply as possible from available materials in compliance with the bath function.
This bath can not be called a sauna. During operation it is of course possible to heat up to 90 t. But this takes a lot of time and firewood. In winter, not to do this effectively. But how wet bathhouse - a decent option. Pour it is impossible - the stones that have accumulated sufficient heat.
Two tabs wood (small insert) is sufficient to achieve a temperature of 70-80 c. in the summer. Square guy - about 6 sq.m.
In total, the construction of the spent bath was 70 thousand. rub. Of them - 50 thousand. payment of the construction crew in view of parse old buildings.
Read more: Where to get free garden trees and shrubs?
***
Subscribe per channel, introducing it in the browser bookmarks. There is a lot of useful information and interesting stories