In my construction project during the years 2014-15-16. a pause. During these years, I did nothing. Sometimes even a thought for the sale of land. However, it did so, my brother, a site that borders mine. Sale of land and bought another in the south of the city within the boundaries of the village. Fled from extortion, he said. Yes, here in our HBC (like any other) is the monthly charges and fees on the development of the project (road, electricity, etc.). On the lands of all settlements there. But there is little you can to that effect.

In these three years, just come, I soared in the bath. Little has been done beds. Each year, planting potatoes (~ 1 sq.m. - family enough potatoes for all the years never bought). But, for some reason decided that until the issue is resolved with the connection to the power grid - to continue construction will not continue. Maybe it's for the best. Because able to change the car, go on vacation to look overseas.

Although, my new neighbor, and many others - have continued to build.

instagram viewer

During these years, participants donated money to the process of connecting to the power grid. As a result, in 2016 we power on the territory of the first field (the first and second joint buyout read in previous articles) put concrete pillars (LEP 10 kV) And the transformer. Transmission line on the second floor and we put the transformer back for their money. As a result, all charges took about 50 thousand. rub. per participant. Yes, there are many proposals for the sale of plots with a ready connection to electricity. But then these were few and at a much higher price. It was expected that the issue will be resolved quickly with electricity. But everything was delayed.

At the end of 2016. it became possible to connect electricity. TU phase gave 3 to 5 kW. You can connect 380V appliances. In principle, now all of this is connected to TU.

Directly connected to the electricity did not, underwent this process at the beginning of the construction season of 2017.

High-voltage power lines and combined the low voltage cable is located below. Transmission line runs along my site. Off-site support from planted a pole, which subsequently our responsible person set assembled panel with the electricity meter and machine guns. Energy spent to it the cable that came down the pole, went into the ground and up in my post to the shield.

Photos 2019.
Photos 2019.
Photography May 2017.
Photography May 2017.

Initial meter readings and acquired guard that I was planning to establish a middle section next to the fence. What was needed was an intermediate guard with a gun and a socket for connecting an instrument, the mixer and the subsequent connection of the house, the garage lighting. Kind of a branch. The layout is shown in the scheme:

plan area
plan area

This season, the work started immediately as soon as the snow melted and the ground is dry.

Decided to hold the power cable under the ground. Very practical. Nothing hangs, technology does not interfere, does not spoil the view (no poles and hanging wires). Yes, a bit more expensive, but worth it. And since you yourself run the cable, then you know where to dig, and where you can not dig Besides the protection of the layer of bricks on top sprinkled with cable - always needed when a gasket. If you come across by accident, we immediately understand that there are cable runs. This trick, by the way, later spared my cable while drilling drill holes under the posts.

I bought:

- Cable AVBbShv 4x16. - 75m
- HDPE corrugated pipe, d40, red - 10m
- Shield metal SchRn-12z-0
- Automatic VA47-29 4P 50A

As well as cable, cable channels, dif.avtomaty, sockets and switches for electricians in the bath specified with this list:

Cable AVBbShv 4x16 - aluminum armor for underground installation. Copper does not make sense to take it, because with transmission line pole to the shield was the same.

With neighbors banded together to purchase transheyakopatelya bars. Unit looks like this:

Photos of the service Yandex. Pictures
Photos of the service Yandex. Pictures

An hour bar had digged trench length about 40 m.

I went for the bricks to relatives in their country house. They are given free of charge. They are, as mentioned above, laid on top of a little sprinkle cable AVBbShv.

Laid cable from the panel (on electric poles) to a bath, started on the wall cable bath roof and lowered in the drill hole in the ceiling to a place near the entrance, where the planned shield with dif.avtomatom.

Dif.avtomat need to protect against leakage. Those. like it works even before the short circuit. Mandatory requirement in electrical engineering in a wooden house. It was possible to replace the RCD + machine, but chose dif.avtomat for reasons of space in the brush.

Maybe put it correctly, but I'm not a professional electrician.

Photos 2019.
Photos 2019.

Photo left - the cable comes out of the ground. Right - leaving the cable on the intermediate plate on the site. One cable - entry. The other - access to the bath. Gray corrugated - connected greenhouses lighting and electrics, which I acts as teh.pomescheniya. But it will be later.

Post processed by brushing technology. And covered with frosting. It looks very impressive.

In kabelkanalah spread the wiring of the bath. Kabelkanaly the color and texture of wood. Switches and sockets - too. Mounted sockets, switches. In the room hung an inexpensive chandelier. Lamps everywhere - E27 LED. The washer - LED modular luminaire with moisture protection SPP-2301 12W 4000K 960Lm. In the pair - just an ordinary lamp with an incandescent lamp.

Terrace: Lamp round E27h60Vt - 2 pcs. and spotlight Wolta 10W 5500K 850Lm.

Photos 2019.
Photos 2019.

The spotlight will turn on a separate switch.

Another list of costs
Another list of costs
Photo 16.06.2017g. Photo after the completion of the electrical installation.
Photo 16.06.2017g. Photo after the completion of the electrical installation.

There is a light, you can play music, all the power the devices. Yes, I hung a hammock, who was waiting in the wings for nearly two years after the acquisition. On the electrical work it took two weeks. He worked every day and every night. The installed it myself.

According to the plan this season, I decided to build a fence. I calculate the forces, decided that I would do with two sides: from the forest and on the east side.

On the west side, my neighbor decided to make a fence for his project - the height of 3m and a huge height and volume of the concrete ribbon below it. It was a surprise to me in 2016, when one day I came to the site and saw these pillars 3 m high then asked:.. Why such a high - was dissatisfied with the answer. More this topic did not start. Therefore, I decided this I told him no help, because with me, he did not agree the project. Although originally thought to build the fence together.

On the front side, from the side of the road, he decided that the maximum - it will establish the pillars of the season, and then we'll see. The beginning of construction of the fence and on the choice of its design and materials - read the following article.

Read more: My choice of design and materials of the fence

***

Subscribe per channel, introducing it in the browser bookmarks. There is a lot of information.

How to feed Eggplants in July to get a record Harvest. I share a secret without harmful Chemistry

Eggplant is not an easy vegetable, and for a long time I was sure that high yields from it canno...

Read More

The most useful food for Grapes

The art of growing grapes originated in ancient Rome, but only today a person has so many opport...

Read More

Is the geology of the site necessary at all?

Is the geology of the site necessary at all?

Any person, one way or another connected with construction, knows that without geology it is impo...

Read More

Instagram story viewer