Useful content

Cottage toilet with his hands

click fraud protection

At the end of season 2012. built cottage toilet. Buy ready did not, because including shipping it came to time (for the quality) of about 10 thousand. Yes, and the size of them, seemed to some children.

I bought:

- Bar 35h40h2000, planed.
- block house, 27h105h3000mm (1,9h1,32 = 2,508h4 = 10,032m2) = 32pcs, 10 m2.
- Metal corners and plates
- Screw-on 75mm and 16mm

Blockhouse sawed on the construction base just below the right size - whatever timber entered his car. Delivery is not ordered.

From the remnants of a flat slate made basket and lowered into the pit, which would ground is not showered. I put the toilet frame:

Photo 18.10.2012g.
Photo 18.10.2012g.

There was a single sheet of metal and cutting. Let them go to the toilet roof:

Photo 19 and 28.10.2012g.
Photo 19 and 28.10.2012g.

Snow fell on this, I decided to complete the construction season. I do not have time to finish.

Final costs 2012 .:

Basic amount went to the gutter system and timber

He continued to work almost a year. Honestly, right now remembering, I can not speak for themselves: why is nothing done in the spring and summer of 2013. Probably I lost motivation. Case with connection to electricity in HBC moved very slowly.

instagram viewer

On the collected funds to the participants was the paved road. While at that time it was the only achievement in the infrastructure of the village.

Photo 13 and 14.10.2013g.
Photo 13 and 14.10.2013g.

The internal construction. It turned out pretty spacious. Gender - cutting floor board, which have remained on the bath floor. Just in case we went trim lining. The floor is covered with varnish.

Photo 16.10.2013g.
Photo 16.10.2013g.

Covered azure for a tree, which remained after painting log bathhouse. Little things, the details still remain, later completed the. Who did not have to go scare the spirits of the forest. )))

Photos 16 and 18.10.2013g.
Photos 16 and 18.10.2013g.

Finally completed the terrace bath. He railing made of planks 150h50mm which was only a few boards. Prostrugal board on the floor and fastened with screws. They always lay in the draft. Azure and covered with varnish. Photo left - assembled structure of a handrail is not planed planks without treatment.

In this construction season and 2013. It was completed. Costs in the year amounted to about 4 thousand. rub. Although details in the design of the final types of interior and exterior of the bathhouse was enough.

***

Read more: Electricity on site. Laying of underground cables and installation of electrical

Subscribe per channel, introducing it in the browser bookmarks. There is a lot of information.

Russian scientists have created an aluminum alloy that can withstand temperatures of 400 ° C

Russian scientists have created an aluminum alloy that can withstand temperatures of 400 ° C

A joint group of scientists, consisting of representatives of NUST MISIS, MSTU named after G. AND...

Read More

Tesla's turbine. What are its advantages?

Tesla's turbine. What are its advantages?

This article is not about Tesla's car. Although, this word is now increasingly associated with th...

Read More

Have you heard about the Romanian well? I show you how it works!

This well was very cunningly arranged: it contains neither the usual bucket that is supposed to s...

Read More

Instagram story viewer