The construction of terraces and roof rafters square log baths
By the end of October 2010. I picked up the wall, placing 16 crowns timber. Seventeen of the project was planned to lay the segments with fixing floor beams - without prostrugivaya because it is under the roof and gables.
To protect the frame from the mold and the darkening of the sun, I bought ognebizaschitu TM "Senezh" 10l. But as it turned out, it was not for the facades, and for the protection of floor beams, roof systems. The photograph shows that the bar has become a little darker. Itself means a pistachio color. Later, after the construction of the bath, I have already covered the frame azure for a tree specifically for wooden facades.
By the way, I forgot to write in previous articles that the floor joists ognebio treated in the same composition, but colorless. To prevent rotting beams.
The photograph shows the construction of open terraces. Design through beams connected to the framework. The beams rest on nailed a nail bar 50h50mm.
I am doing so. I put three vertically pre offcuts into desired size timber, fixed vertically boards. Then he had to suffer with the installation of the horizontal beams. Well, that was an assistant. One put the beam would be very difficult.
Yes. to compensate for this shrinkage log, a vertical bar-shaped uprights drilled hole depth of 10 cm. It is inserted into the bolt and above it rests through the washer and nut to the horizontal beam. The result was a budget option for a penny. Later, when shrinking log several times dipped beam by turning the nut. A log house dipped Observations about 5 cm.
It was possible to buy ready-made structure, a system of compensation timber shrinkage. But I was not looking for, but in my eyes it did not come across. There was then the construction of hypermarkets with their huge range. What would you find something, you had to search the Internet, to ring the organization and travel around the city.
In late October, the weather was excellent, allowing you to work comfortably. Evenings were cloudless, increasing clear sunset somehow daylight.
I began to erect the roof truss system. The project was planned gable roof, the length of slope equal to the lengths of the two sheets of metal.
In the beginning I found the wooden house on floor beams. They are made as floor joists - two bonded boards 50h150. Before their fix on the wooden house, I made them drunk under lock rafters. This is shown in the picture:
On the ground lay one such beam and rafters "letter A" I've been doing for its size. Next in turn raised the rafters and installed. Between rafters at the blockhouse beam segments were stacked a meter wide. Rafters nailed to logs and lumber to these segments. And segments through dowels also fixed to the framework. Rafters vertically temporarily fixed interval board through screws.
In early November, the first snow fell. Work was no longer comfortable. I started the installation batten. We used Edged board 150h25 mm. Nailing their nails with a pitch of about 30cm. Until the end of the planned volume of construction works in this season was not much - to cover the roof with metal. About this in the next article.
Read more: Installation of metal and the final cost of the season during the construction of baths
Read from the beginning: Why I decided to build a house? remembering the past
Subscribe per channel, introducing it in the browser bookmarks. There is a lot of information.