The technology of construction of the walls of the timber. The speed of the samostroyschika
Ahead to start work, the result of which can be seen every day - this is the construction of the walls.
Its process of construction of the timber can be described as follows. Shot bar with a stack of assistant, measured out the required length, saw off a chainsaw. Then I mark up the spike or notch on the tool bar and to cut them. He threw a beam assistant on the frame and on both sides prostrugival electroplane with chamfering. Elektrorubanok I is powered by a gasoline generator, which is wound up at the time of this work. About the process further - read below.
There are several types of timber stacking: tongue and groove, in a paw, "dovetail". I settled on a rectangular version of "thorn-groove". We need these drank for what would have been blowing logs and lumber that would lay himself more steadily. That would not permanently mark gon every board I cut out the pattern of the linoleum and rascherchival on it. This method allows you to quickly mark a bar.
"Spike" cut only a chainsaw. A "slot" did: did two cutting chainsaw and then beat out the excess with a chisel.
For additional clamping bar must be put in the dowels:
Now sold in almost every construction base.
Usually do so: a bar placed on jute or hemp, or moss and drilled through powerful drill 20-25 cm. Then hammer dowel sledgehammer.
It is better if the dowels will come with a slight effort, that would not bar hanging in further shrinkage in these shkantah. I found boring machine and was not looking hard because one of the objectives of my assistant was vystrugivanie dowels of scrap lumber.
I did not have a powerful drill, but was puncher. After trying them in drill mode to drill beams through, I realized that he was weak. Or he will not survive this construction, or I would do differently. As I have done:
It is planned to drill hole locations on the upper and lower tool bar in a position where the top lies strictly in its place. He shifted beam, pointed gon middle bar in front of labels and drilled in all these places. Drilled in the upper face of the bottom timber and the bottom of the upper. It turned out that the openings facing each other. The lower hole insert dowel.
Then unroll hemp linen. Regretted not having bought a linen jute. It is smooth, uniform thickness, gives a minimum thickness of insulation, frame it looks more aesthetically pleasing. But this, I think, will be a separate article.
In windy weather, it is necessary to have a furniture stapler that would grab and fix tape and insulation to timber when laying it did not move the heater:
Two people stacked timber in its place. So four times for the exterior walls. A night and a working time of 3-4 hours of time to put only one crown. Sometimes to saw blank for the next.
There were days and nights when I did not go to the construction site. They visited relatives and had some other reason. These "truancy" I really did not like. The task was to close this construction season finished with a box and covered with a roof bath.
Read more: Mezhventsovogo insulation. Why am I would not have bought a linen tow!