Frost for construction is not a problem. I tell you how I made a budget foundation for a barn 2 * 3 meters in winter

click fraud protection

Is it possible to build in winter? The question is incorrect, because everything depends on the weather and other conditions. For example, a FORUMHOUSE member under the nickname alstaf easily erected the foundation for the utility block. How he did it - read on.

Photo courtesy of alstaf
Photo courtesy of alstaf

Why the construction site fell out specifically for the winter

The chores in the garden are over, now only snow removal remains from work on the site. From the old owner, a shed in a terrible state remained on my site. Yes, and it still stands in the middle of the site, it takes a place. I have long wanted to replace it with something better and put it closer to the fence. Dropped out fell on a wooden utility block or shed.

How to choose the size

The size for the new utility block chose 2 * 3 meters. I need a shed for storing hand-held agricultural implements such as shovels, hoes, rakes, and for other inexpensive little things. There is a 5 * 7 m garage for storing more valuable things. Considering the length of the lumber is 6 meters, the size of 2 * 3 meters is very economical. And also the size 2 * 3 is convenient for transporting boards on the trunk of a car.

instagram viewer

I was considering the option of building a shed made of iron, especially since there was an experience of such a construction in 2013 in an old dacha, but I did not want to cook in the cold. Cold metal, plus the masked glass sweats, and a number of other inconveniences.

Photo courtesy of alstaf

How was the work

I'll make a reservation right away: there is a house next to it with gas heating and all the amenities, so I do everything slowly on weekends.

Foundation: since the site is with a slope, the choice fell on metal poles 108 mm and 78 mm. A garden drill drilled 6 holes with a diameter of 220 mm to a depth of 70 centimeters. To the pipes I welded heels, such as the head of a screw pile, from both ends of the pipe. The heel that goes into the ground is a circle with a diameter of 200 mm, and on top is a rectangle of 120 * 200 mm. He buried it, tamped it down, did not concrete it. Dry cement mixture M150 was poured inside.

Photo courtesy of alstaf
Photo courtesy of alstaf

I considered screw piles before starting construction, but give more than 10 thousand. It’s a pity, the pipes were much cheaper. The fact that they were buried above the freezing depth - I understand this, but I'm not particularly afraid of frost heaving due to the fact that the slope and water descend along the slope on the site. Yes, and the building is not a residential house, if I fix it.

Pile binding

Then the question arose with the binding of the piles. Considering the size of the building, I settled on a beam or board (as anyone) 40 * 100. Several were in the bins.

But here it turned out that in the nearest construction markets there are only 50 * 100 or 40 * 150 boards. As a result of calculating the cost of the material, I stopped at 40 * 150. The width of 150 mm is very good for a budget barn, so I spread it lengthwise and got 2 pieces. 40 * 73 mm. The budget was glad!

Photo courtesy of alstaf

On the side of 3 meters I hammered together and additionally twisted with screws (mixed) a bar 40 * 73 (vertically) 40 * 100 (horizontally) in the shape of the letter L. On the side of 2 meters of floor joists 40 * 73 mm. Seven pieces (so far put 3 pieces). Installed at the corners of the rack 40 * 73 mm.

I plan to have a single-pitched roof, so the size of the rear wall racks is 190 cm, and the front ones are 230 cm. The jibs are temporary. I screwed on the horizontal, top, side bars and replaced the rear wall jibs with permanent ones.

Photo courtesy of alstaf
Photo courtesy of alstaf

Plans

I continue to build a shed slowly. In the evening, they raked away the snow that had piled up in a week, in the morning he dismissed 2 more boards, put the guides under the door, tried on the door leaf. The door was given by friends - China is in a new building from the builder, they are usually immediately after repair, and some even before the repair are changed to normal ones. This will go to the barn.

Did you build anything in winter? Write in the comments!

Friends, there are already more than 45 thousand of us! Like, subscribe to the channel, share the publication - we are working, so that you receive useful and relevant information!

Read also:

  • The castle in the country is frozen - what to do? Ways to open an icy door when there is nowhere to get boiling water.
  • Homemade sausage: simple and doctoral. Here's a recipe for how easy it is to prepare an excellent meat delicacy.

Watch the video - Foam block chalet house: project overview, materials, energy-efficient glazing.

What to do to make the petunia rise quickly. Why do I use a crush and boiling water. I share my experience

What to do to make the petunia rise quickly. Why do I use a crush and boiling water. I share my experience

Petunia is sown in different ways. But in order for her to ascend quickly, you need to help her i...

Read More

Telecom operators warned that about 1 million smart metering devices could be outlawed and require replacement

Telecom operators warned that about 1 million smart metering devices could be outlawed and require replacement

So about one million used "smart" electricity meters in housing and communal services may not fit...

Read More

Wood treatment with activated carbon or soot from the stove + 3 more ways to decorate wood

Wood treatment with activated carbon or soot from the stove + 3 more ways to decorate wood

The final stage of work with joinery (wood) products is especially important. Without processing ...

Read More

Instagram story viewer