10 Simple Steps: How to make high-quality steam with their own hands
Three years ago, the family moved from "odnushki" in his house. Well, a house without a bath? It was decided to do a bath adjoined to the house, so as not to run around with the kids in the cold (in the Sverdlovsk region of cold winters).
Before repairing thought out layout of the pair:
- One must have windows for ventilation volley;
- The presence of ventilation;
- Finishing walls at the furnace decorative stone;
- Finish the rest of the walls and ceiling of lime lining. Shelves, too, lime;
- Granite flooring for easy care;
- Glass door.
Repairs consisted of 10 steps
First step
We drank a hole in the wall and set up fake window in it (photo 1).
The second step
Drill holes for ventilation and chimney. Two (the ceiling and under the shelf) for connecting ventilation. One at floor level behind the stove for the supply of fresh air. One over the stove to the chimney.
The third step
Made a waterproof floor mastic. On waterproofing glued tiles of granite. The glue used is suitable for underfloor heating.
fourth step
Install the door.
fifth step
On the ceiling and walls in the double sided tape pasted aluminum foil. Taped seams aluminum tape. On foil secured electrical wiring of heat-resistant wires. Top foil pressed pine rails for mounting lining.
The sixth step
Klyaymerami on rails and nails attached bunk. She lime varieties "Extra".
A little trick. Under the regiment was made not lime and pine paneling grade AB. This will save about 3,000 rubles, and the bunk under the regiment still have not seen.
Battens treated with preservative for steam rooms.
On vents installed wooden gate.
seventh step
Made shelf frame. On the frame rails fastened linden regiment. Between the strips of 5 mm intervals for ventilation. Dimensions shelf: height 0.9 m, depth of 0.67 m Dimensions stalls:... 0.45 m height, 0.38 m width front shelves sewn lining. Reiki regiment impregnated with a special paraffin oil for «Husky Siberian» regiments twice.
The eighth step
On the walls, where there is no lining on the heat-resistant mastic glued decorative tile under a stone.
A word of advice. When buying tiles in a shop recommended to open the package and check for defects and the same size.
The ninth step
mounted stove
The tenth step
Chimney installation and filling of stones in a grid-heater furnace. Chimney and stones ordered in Yekaterinburg and after delivery are simply installed in its place.
And yet, it is possible to bathe!
p.s .:Subscribeper channelMy house- all the most important, useful, interesting is yet to come!Everyone can share their experience in the construction, repair and improvement of housing, suburban area, send photos, tell me about your country, house, apartment.
See also:
Perfect guy. What you need to consider in the design and decoration
As I settled down and updated the old bath