As I settled down and updated the old bath
With our upgrade history and renovation of the old baths shared our reader Alexei Nikolsky of the Kostroma region.
Good day, dear readers!
My name is Alexei Nikolsky, I live in the Kostroma region, have a small suburban area, where I located a small farm. At the end of the summer I had a free week or so, and I decided to remake his old bath to autumn and winter can be a really good warm up.
I would like to share with you this story, also I put a lot of pictures, so you can get acquainted with my writings.
That's room looked originally:
More than 12 years I have served for this room, soared whole family almost every weekend.
As you can see, inside the situation is no better - the old furnace, been heated almost to black, logs soot on the walls. In short, all stop very depressing.
And so, the action plan I was: to make a good, solid foundation, obdelat everything inside and out, replace the furnace to a more modern, to put a new tube and cover the roof. Inter alia, decided to renew and dressing room.
new foundation
Drew from the bottom bearing logs.
As you can see, the old foundation of the role I have performed the old telephone poles. I have decided to replace them with cement mortar classic, but added more and masonry (for greater reliability and protection against moisture).
Old doorway closed up scraps of logs, all the cracks filled with foam.
Immediately before saw was at hand, he drank a new doorway into which you can enter from a new waiting room.
The new furnace
After dismantling the old furnace immediately ordered a new in-store. In the meantime, went to me, I had to lay down a new foundation under it.
I did not forget about fire safety - a wall adjacent to the furnace protected from the intense heat. But to give the aesthetic appearance of my makeshift defense, all adorned with temperature-resistant stone.
And here came the long-awaited oven! After spending all measurements, set it to a new location. I did not the first time, so it was not so difficult. Also acquired new tube furnace.
Plumbing and lining
For simplicity and convenience to connect water supply boiler (it is specifically designed for baths and saunas). His statutes, parallel obtyanuv ceiling construction foil and insulation.
As with most ambitious part - finished walls - longest fussed. The lining in some places did not want to dock, some boards are simply cracked.
"An important point - do not skimp on the bunk, better once to overpay than to a long time fiddling with poor material that breaks down and does not docked"
Still, despite the difficulties, I got a very beautiful finish.
Waiting room
Where do without the changing room? With him, I decided not particularly suffer, so cook it from the glands, which lay in the barn. Paul laid out the old boards.
Outside, it is trimmed sheets of corrugated board, and the inside - the remnants of lining. It turned out cool and at the same time simple.
The roof and the final finish
Sheets of corrugated board in handy here - now the roof will not leak, and will withstand the pressure of the snow drifts in the winter.
Immediately proceeded to finish the outer part. Molded in aid. The lower part, about half a meter, trimmed with decorative bricks.
And here is the final image, inside and out:
I hope that my story will help you if you also want to repair the bath and changing room. The main thing - to do with the soul and not be afraid to make a mistake. Thanks for attention!
p.s .:My HouseHe is trying to give you the most important, useful information.subscribe to the channel - in front of a lot of useful and interesting information!