How to make repairs in the bathroom without the high cost
We have a very long time did not dare to start a renovated bathroom and toilet. We are exploring options for how to arrange the data space, for repair bathrooms - one of the most expensive in the entire apartment. The apartment are going to lease, so too much money to invest in the repair did not want to, but I had to make acceptable quality and appearance.
Replacement of plumbing and pipes
We started to repair a pipe replacement. Used materials:
- sewer pipe - plastic,
- cold water supply pipe - repoussage,
- hot water supply pipe - copper.
After replacing the tubes put directly counter to record the hot and cold water, replaced towel. Then we set a new toilet, a bath. We took a bath metal. To not rattled tub during water intake, the bottom of the bath on the outer side covered with foam. This is a very good reception, in addition to insulation, this bath and keeps the heat very well.
wall design
When finished with the plumbing, we began to design walls. Having considered the recommendations masters, opted for PVC panels instead of the traditional tiles. Really liked the choice of pattern and color range was pleased. As a result, the walls of the bathroom and toilet were transformed and look great.
Before facing walls closed ceiling, used as PVC panels. First attached metallic profile spotlights conducted, then tightened panel. Raised panel used, as it helps to mask the joints.
The walls in the bathroom and the toilet have been quite straight, the old tile was made by previous owners of the apartment, so that preparations for the installation of the panels did not take much time. Crepe panel without using the frame directly on the walls with liquid nails.
In the process of mounting the panels it is very important to follow the instructions with liquid nails. First had to apply them on the panel, then pressed to the wall, to tear away from the wall and give a little dry, and again pressed to the wall, already definitively. Nevertheless, the process of lining the walls went very quickly. In one day, finished bathroom wall, in the second - the toilet wall.
Completion of repairs
At the final stage did Paul: lined with cement floor tiles laid. Installed new doors, faucets, completed the little things.
In general, renovated bathroom and toilet took us one week. Special inconveniences have not experienced, so made repairs in the summer and had the opportunity to spend the night in the country.
Repair of bathroom and not only the most expensive part of the repairs in the apartment, but also the dirtiest. Therefore, it is best to do this work to repair other rooms in the apartment. By monetary costs it did not work out very expensive, since the use of PVC panels instead of tiles on the walls dramatically reduces costs.
Subscribe to the channel, the only way you will be informed of new publications - in front of a lot of new and interesting information!
p.s.: We try to give you the most important, useful information. If you have been interesting and helpful place "like".