Construction of sewerage in our 'hamlet' house - another story, which I want to share with you. We address this issue long delayed. The fact that the manholes have had to stay in the parking lot. If you do the excavation, it will be impossible to import construction materials. It was necessary to choose a convenient time. We chose the time between the last importation of concrete blocks and the start of delivery of the timber for the roof.

To start with almost the center of the park was excavated a huge pit. The size of it, I do not remember, but to stand on the edge of it was scary.

I dug a pit my husband. In this he was very helpful to our workaholic - a tractor. Finally, its capabilities can be used for the benefit of our building.

The situation is complicated by the fact that along the park we had planted small arborvitae (their little seen in the photo with a pit). The soil from the pit of her husband shipped in truck, who was standing behind the fence. Bucket to the ground constantly need to be moved over the tiny trees. I am proud to say that in the regeneration of sewage none Thuja is not affected.

instagram viewer

After the pit was ready, it was installed two wells of concrete rings. The diameter of each well - 2 meters. The height of the suction well - 3 meters below the overflow we did, he's a two-meter. we are not concreted the bottom of wells. We have a depth of 3 meters - continuous layer of clay. Between wells is connected an overflow pipe.

Distance from the bathroom to the wells we have quite a lot, about fifteen meters. In order for the pipes do not start in the center of the well - they have to be recessed. To set the hatch husband laid a few rows of brick masonry. Now manhole cover will be at a future paving tiles, which we plan to put parking.

Void we filled with debris, and the upper layer otsypali CBC (sand-gravel mixture). Almost all the work had to be done by hand to avoid damaging the arborvitae. Ramming surface rollers.

Wells dug, it was the turn of laying sewer pipes. With the help of best friend of the builder - a shovel, two trenches were dug. The thing is that we have the kitchen and bathrooms are located in different parts of the house. In this case, the route of pipes from the kitchen (if it is to pull the bathrooms) had to go to the opposite side of the well. In order not to drive water through such a path and two exit sewage out of the house were made.

Slope husband made a small - one centimeter per meter pipe. From the kitchen a little more bias - one and a half centimeters per meter. It's all the same due to the distance from the exit point to the suction well. Stack pipe bricks.

The holes in the sewer manholes husband did his old friend - puncher. Dusty work, but fast enough.

After installation of the pipe it is closed up edges of the opening with cement mortar.

When the pipes have been laid in the desired level, the husband to sleep off the ground under their sand. He fell asleep on top of the usual ground, who had been removed from the trench. In the house we exit sewer is at the installation site of the future toilet. Sewer pipes from the bathroom will be laid in ducts made of plasterboard.

We have been preparing themselves to work with the installation of sewage that for a long time could not believe that everything is finally over. To a greater extent this applies, of course, me. The defeat of the plot, dug pits and ditches, piles of earth - all of this I was very depressed. I try to maintain cleanliness in their ancestral lands, even during active construction. Before work on the sewer I almost always work. However, the work was done important and necessary. No sewage normal operation of a ship called the "Mother House" - it is impossible.

On that channel everyone can share its experience in the construction, repair and improvement of your home, suburban area, send photos, tell me about your country, house, apartment. And we will tell you about my little house on the canal. Information and photos (preferably horizontal) send to [email protected]

Subscribe to the channel - in front of a lot of new and interesting information!

Kitchen renovation 8 sq.m. for 20 tr. with new furniture, is it possible?

Kitchen renovation 8 sq.m. for 20 tr. with new furniture, is it possible?

Our subscriber shared her repairs with us.Every woman spends more time in the kitchen, and also w...

Read More

What are the blue pipes along the railroad for?

What are the blue pipes along the railroad for?

Traveling around Russia by train, or just riding the train, you probably noticed that during in m...

Read More

5 Worst colors for a summer residence. I do not advise anyone to plant them

Everyone who has their own summer cottage has thought about transforming it through vegetation at...

Read More

Instagram story viewer