In this release, we will tell about the repair of a country cottage, which is made in 2018 in the Vladimir region. A few words about why and how this object was interesting. The fact that the object is a square log house with attached horizontally side branches (rooms) as well as heightened two floors, one of which is full and the second attic. Thus, the cottage is a three-storey building, which at the time of commencement of work, it is currently living. The entire catch was that the first phase of work is to complete the replacement of the floor of the first floor, with that all the partitions, load-bearing walls and other power structures were based just on this very floor.

In the image below, shows a general view of the object, as well as the state of the basement ceiling at the time of commencement of works:

The general form of the object
The general form of the object
Status basement floors
Status basement floors
Columnar support under logs
Columnar support under logs
Supports of asbestos cement pipes
Supports of asbestos cement pipes
Rotten logs and dumped insulation
Rotten logs and dumped insulation
Rotten logs and dumped insulation
Rotten logs and dumped insulation
instagram viewer

As seen from the photo, as intermediate supports, pillars used brick or asbestos cement pipes, wherein the small penetration (about 30-40 cm) that, along with the rest, the most negative impact on the reliability of the design, namely due to seasonal movements of soil and inadequate burial towers, some of them fell on its side, and due to the influence of humidity in the underground, constructive pillars made of bricks was partially destroyed. In addition, due to lack of ventilation, the floor of the log, as well as Hem, rotten - as a result, some of the insulation just fell out of the ceiling to the ground. A similar situation and the example of the repair work we have described above: https://dachamaster.org/services/construction/remont-zamena-derevyannogo-pola-v-dachnom-dome/.

It is exacerbating the situation and the fact that firstly, the cottage has been living, that is, have been carried out, connected and put into operation all the engineering system and also, as noted above, transmitted to the first floor from the load bearing structures of the second and third floors.

For successful implementation, and most importantly, complete the work, before removing the flooring of the first floor, had by all Power structure upon which the load transmitted to sum temporary support and only thereafter to carry out dismantling. The total area of ​​the first floor sexes was about 120 m2. The technology of dismantling and subsequent installation of the floor we will not describe in detail, as We did not do it already once, for example here, here or hereAnd give only a few photos before and after repair the floor of the first floor in the cottage:

Kitchen Floor replacement
Kitchen Floor replacement
Kitchen floor after replacement
Kitchen floor after replacement
Corridor to repair
Corridor to repair
Corridor after repair
Corridor after repair
Bathroom before renovation
Bathroom before renovation
Room after restoration
Room after restoration

Here are some photos of the process of repair and restoration works on the floor of reconstruction of a country cottage. Once again I want to draw your attention that as new lag at all its facilities, we use wood I-joists:

I-laying lag
I-laying lag
I-laying lag
I-laying lag
Mounting battens
Mounting battens
Laying of laminate
Laying of laminate
Laying of laminate
Laying of laminate

Together, with the reconstruction of the floor, it was carried out works on the replacement of all interior doors, reconstruction bathrooms, tiling in interfloor shaft (where the ladder) is laid tiles on porch input group. Below, we give a few photos of the listed works:

Replacing interior doors
Replacing interior doors
washed down cashing
washed down cashing
Bathroom renovated
Bathroom renovated
Laying tiles "on a stone"
Laying tiles "on a stone"
Laying tiles on the porch
Laying tiles on the porch

Next phase of work has been done: reconstruction of the fence (the dismantling of the old wooden fence and installation of fence WPC boards), reconstruction porch near the farm buildings, including the arrangement of the steps directly from the duodenum to the metal frame and the gangway-rolling garden technology. Below are some photos from which will be clear what is at stake:

Fence of the duodenum after reconstruction
Fence of the duodenum after reconstruction
Fence of the duodenum after reconstruction
Fence of the duodenum after reconstruction
The construction of the porch and the gangway
The construction of the porch and the gangway
The construction of the porch and the gangway
The construction of the porch and the gangway
The construction of the porch and the gangway
The construction of the porch and the gangway
The construction of the porch and the gangway
The construction of the porch and the gangway
The construction of the porch and the gangway
The construction of the porch and the gangway

More detailed information on progress of the work and the result can be found in our photo gallery. Total time of execution of works on repair of the cottage, was 2.5 months.

We turn waste into what is needed and useful. Part 1

We turn waste into what is needed and useful. Part 1

Second life: portal members share their life hacks for making useful things from potential garbag...

Read More

How to buy a house for 1 euro in Europe

How to buy a house for 1 euro in Europe

Buying a house in Europe for only one euro - such announcements regularly excite the minds of tho...

Read More

I changed the pallet for a shower stall. Something to think about.

I changed the pallet for a shower stall. Something to think about.

Photo 1.An acquaintance who had worked for 6 years ago called: "We urgently need to change the me...