Compared to other technologies cottage construction, construction of frame houses under the key has a number of advantages. Wood is a versatile material that is equally well suited for the construction of dwellings and outbuildings.

The advantages of frame construction

- all-weather construction. Season does not matter - the construction of buildings can be carried out at strong frosts, and with intense heat. On already prepared foundation can install components of the frame structure, which is not afraid of changes in temperature and high humidity. This was made possible due to the absence of "wet" processes in construction.
- Small erection time. Standard frame house 140 m² turnkey will be ready to move in only five to seven weeks. The longest process - it's interior, rather than the installation of the structure itself.
- High heat-saving performance. Modern insulation materials are used in the regeneration of the cottage. With this it is possible to achieve a good thermal efficiency and economy.

instagram viewer

- No shrinkage at home. Respectively - can be settled immediately on completion of the work, plus everything in a year or two, the owner will not have problems such as cracked finishes or skewed windows-doors.
- No need for heavy equipment. First, it greatly reduces the cost of construction. Secondly, it makes it possible to install the building in places where buses simply will not pass.
- Good insulation. For use mineral insulation wall boards that absorb extraneous noise and create a pleasant atmosphere in rooms.
- Long service life. With proper care, the structure has a lifespan of 85 years.

It is worth mentioning one more important advantage - the price of frame houses much lower than similar buildings of brick or foam blocks. Even with a small budget will build a comfortable and spacious country accommodation for the whole family. The main thing - to apply to the contractor with a good reputation, which can guarantee the high quality of the construction.

Construction stages frame cottages turnkey

The first and most important stage - the design work. The customer can use the operating time contractors or order the production of individual design project future housing. At this stage it will be determined by the final cost of the work, as well as the following points:

- area of ​​the house;
- number of floors;
- the number and location of the rooms;
- the type of roofing;
- the type of wall panels;
- interior and exterior finish;
- the need for additional outbuildings.

As for the building itself, there are the following steps:

1. Construction of the foundation. Its type and the supporting structure is calculated for a specific structure. For the most commonly used foundation bored piles or pile-base casting method rostverkovy.
2. Delivery to the site and assembling the individual elements of a skeleton in a single structure. On the front side of the house siding or sheathed lining, while the inner cavity is filled with heat insulating material (typically - mineral wool).
3. The construction of the roof. First, set the rafters, and then carried out the installation of the insulation and the roof decking.
4. Construction of the floor, its hydro and thermal insulation.
5. Interior finishing work.

Depending on the customer, frame houses under the key may include additional work. For example - carrying out communications, connection to a central system, gas, water, electricity, as well as Accomplishment section.

Heliogen's AI-powered high-temperature solar station to be tested in the US

Heliogen's AI-powered high-temperature solar station to be tested in the US

The development of solar energy is progressing by leaps and bounds. So the American mining giant ...

Read More

Didn't know how to cover the porch steps in a cold room and accidentally found a great option

Didn't know how to cover the porch steps in a cold room and accidentally found a great option

The beautiful carved porch from the courtyard to the house has not yet acquired its final appeara...

Read More

I had a safe in my apartment, and I want to buy it into the house, but only a more modern one: what did I manage to choose

I had a safe in my apartment, and I want to buy it into the house, but only a more modern one: what did I manage to choose

The apartment in which we lived for 20 years was located on the 3rd floor of a brick building. Wh...

Read More

Instagram story viewer