Finishing loggias and verandas country house.
In this review we will discuss about another, not very big, but interesting work carried out by our company in one of the villages on the Kiev highway. Works were carried out in the framework of external finishes verandas and balconies frame holiday home.
The task: Protection against ingress of rain porch and loggia frame house. To this end, we proposed to close the building envelope cellular polycarbonate, and the openings of the enclosing structures special solid film, the type of the one set in the summer cafe, which is to navigate through the steel cable for opening - closing (the principle curtains). Since that film we do not do our work was limited to installation of polycarbonate, and further customer instructed to mount the gutter system on the eaves of the roof.Progress of works: In the photo below you can see the object to the exterior trim verandas and balconies cellular polycarbonate, as well as the installation of drainage system:
Given the cold season, as well as the lack of heating in the facility, we decided on the preparation of blanks, including cutting, preservation of, stain on our database. After this is done all the preparatory work blanks were delivered to the site:
Just finish walling frame house was represented as follows: in each cell, along its perimeter, were mounted prepared by supporting bars, which are mounted polycarbonate. Result finish verandas and balconies frame house you can see in the photo below:
The next and final stage of our work was the installation of drainage system on the eaves of the roof. There is nothing special to describe in detail - the only thing you should pay attention to is the need for reliable fastening of drainage system, as well as compliance deviations. Please also note that we are able to offer very attractive prices for both installation and materials drainage systems. The result of the work on installation of drainage system you can see in the photo below:
More detailed information on progress of the works can be found in our photo gallery. Total time of execution of works on finishing verandas and balconies frame holiday home cellular polycarbonate, as well as the installation of drainage system was 5 days.
- 21