Useful content

Fill Laying nets. We do everything together, at once.

click fraud protection

I thought that after as my favorite took with me the concrete for the foundation, she no longer appear on our construction site😆. But I should not have doubted it. Now we fill Laying nets.

✅ At first glance, to take 15 concrete cubes are much heavier than sugar and 1 m. Cu. samomesa. But when it comes to different places pouring the foundation and Laying nets, then things become not so obvious.

It's one thing to fill the earth, and the other, to raise the height of the concrete.

For planning the construction Laying nets me it was important to make it the most "small", in terms of volume of concrete. I realized that all help to fill me is only my second half, and with the primary exercise will be on me.

What I got, see this article.

Approximate amount of concreteWho had to fill in was less than 1 m. cu. But I knew that to raise all the top will not be easy and will take a long time. Therefore, the work began in the morning:

  • First, we sifted sand.
  • Then they started to mix. In this rubble in buckets, imposed and carried my assistant.
  • instagram viewer
  • Knead one party, pour a bucket and carried. Then he threw in the woods, climbed up himself, and dumped everything into the formwork.
Generally, a lot of movement, and all at the same time with the concrete in his hands. Physical activity certainly big, and it was impossible to relax especially since time is also not infinite.

Important nuances.

1️⃣ sure to vibrate the concrete. This is a major procedure, and all of its benefits see clearly.

In the process of the concrete right "boil" and all the air comes out of it. And at the same time sufficiently thick mass (no plasticizers I have not used) Is very easy to fill all the corners of the formwork.

2️⃣ not forget that the concrete hardens. Therefore, the fill was in all directions.

  • Given that the process lasted for the whole day, if I started at one end, and walked in a circle in one direction, then by the time I would go back to the beginning, the concrete would have stood here.
  • When that was sunny weather, setting faster. And I have to keep the monolithic solution, first went and poured in one direction, then in another. Then there is another direction. And so it ran in different angles.

3️⃣ Watering concrete during pouring water - it is also important. Again, at a constant sun, as we have, it is generally necessary.

As a result, we have worked up to 10 pm.

Of course very tired and exhausted, but it did.

Now we need to wait a while. Honestly I do not know who said that after five days already can be placed overlapping, who a month. I think you need to wait for weeks of stalemate.

🔹Subscribe to KANAL🔹and put the Huskies. The process continues and is still a lot to catch ..

How to align the slope perforated corners

How to align the slope perforated corners

Picture 1.Those interested in Installed window trimI want to please the forthcoming phased proces...

Read More

After spending only a few thousand, completely transformed the kitchen. Photo before / after

After spending only a few thousand, completely transformed the kitchen. Photo before / after

Can I change the kitchen completely, if the money for capital, so that there is even on redecorat...

Read More

Change the valve to the tank. The analyst slide. Master OK

Change the valve to the tank. The analyst slide. Master OK

Friends, understand very well how many problems arise because of a broken drain fittings, so I pr...

Read More

Instagram story viewer