Jumpers its rukami.β Do not put extra reinforcement.
The construction of his house - it is primarily a mental process. And the understanding of even the simplest of things will not spend the money wasted.
At its construction I'm not just doing something in reserve, and just in case.And all this only from a lack of some knowledge and experience. But over time, you begin to think more and better... π
β And now, coming to the next crucial stage for the construction of bridges over the openings, I thoroughly thought out all the pros and cons and make conclusions.
Learn more in these articles:
Jumpers in the aerated concrete house. Important criteria for the selection.
Lintel above the openings. As I have simplified a job?
As a result, we have such a structure:
Now we need to solve the problem with the valve.
The design of the bridge is fittings and is responsible for everything. After all, the role of bridge, keep laying over the opening.
β Yes, only the masonry. The load on the overlap will be perceived monolithic Laying nets.
Therefore, it makes no sense to fence jumper with a hefty pile of rebar.
In his case, I put two reinforcement rods 8 mmthe bottom of the jumper, Where she will work on stretching. Top fittings simply useless.
On the big bay window, I still reinsuredAnd put three armaturiny.
β With that according to the rules still need is reinforced by the top of the entire series, This would be sufficient.
πΉ themselves bound binding wire rods, and put on the stand that I have stayed with reinforcement of the foundation.
πΉ To provide a protective layer of concrete on the sides, I screw the screws stand, which will not allow them to move out to the walls by pouring.
Now was the final stage in this case - the pouring of concrete. About all the nuances of this process, read the following articles.
πΉSubscribe to KANALπΉand put the Huskies π.