Useful content

My building. Economical paneling.

click fraud protection

Another part about my build. Period from 21 July to 18 August. During this period, in addition to skin and dug a small cellar.

Unfortunately, high-quality photos are not kept, and found only this.

Inside the cage, I sheathe the same rack as the only polished on the outside it, so that later it was easier to paint.

Even when he made an outer skin, I found that this rack "walking" in width and if its cutting and splicing of racks you get not very nice. As a result, I decided to make a continuous series.

This solution has allowed me a more economical use of rail. And it turned out this way: start at the bottom of the angle rail carried by the level up to the next corner or doorway. The ends of the rails tested and pre-cut at 90 degrees, if the angle was not straight.

Rail nailed entirely, following the end of the dock, even if this place was not stable, and so the whole series to the corner. The second row started on the other side and turned the series overlap in the masonry. Even if the joint did not get on the stand he has not hung, as it kept the other ranks.

instagram viewer

Rail nailed nails that are slightly recessed and plastered. Incidentally simple way zaglubit bonnet thin nail - taken large nail or screw (100 mm) and applied hat to hat hammered thin nail, then a little hit with a hammer on a large hat and a thin nail sunk in the millimeter.

More details on the skin can be seen in the video clip below.

Sheathing in took a long time due to the grinding. Work laborious, polished belt sander. Since a large amount of work, and before that, too, was a decent load on the hands, by the end of cladding my joints creaked on their wrists. This happened to me the first time and had to resort to medicine. The pharmacy buy cream with chondroitin, and in a sports shop wristbands. And it helped!

Then, too, it was a very interesting stage - the filing of the ceiling, but this topic will be the next time.

Previous material on my building:

As I built the house. Wall insulation.
As I built the house. Installation of windows.
As I built the house. Roof.

Subscribe to the channel, put the Huskies, write comments. I will be glad to communicate.

Alexander.

Despite all the obstacles, the first string of Nord Stream 2 is ready for commissioning

Despite all the obstacles, the first string of Nord Stream 2 is ready for commissioning

According to the Nord Stream 2 operator Nord Stream 2 AG, from the technical point of view, the c...

Read More

Sber showed his drone, which surpasses Tesla

Sber showed his drone, which surpasses Tesla

SberAutoTech, a member of the Sberbank ecosystem, demonstrated at the last St. Petersburg Economi...

Read More

Coal or wood pellets to heat your home? Why benefit can play convenience

Coal or wood pellets to heat your home? Why benefit can play convenience

In the process of designing your home, it has been allocated, the combustion by an automatic soli...

Read More

Instagram story viewer