Useful content

Here she is! Staircase after renovation. Materials and photos

click fraud protection
Picture 1.
Picture 1.

Finally came the moment of completion of repair of the stairs, which is pretty long. I can even share pictures of key results. It seems to be quite good and came home smiling, then order.

Perhaps you remember the recent article in the repair blogceilingand slope about foaming pipes in the ceiling - all this is done within the framework of this project.

Ceiling

Picture 2. Ceiling before the filler.
Picture 2. Ceiling before the filler.

By the staircase adjoins another small hallway upstairs. Thus, the overall ceiling of the corridor on the 2nd floor and the staircase, 9 sq. m now looks like that. That it had to be cut and zapenivat three pipes.

Picture 3. Ready ceiling
Picture 3. Ready ceiling

For his finish used:

  • 3 liters primer Ceresit CT 17;
  • 5 kg putty "Knauf Fugenfyuller" (reinforcement plates joints)
  • 15 m-mesh serpyanku (for reinforcement)
  • bag starting putty Knauf Start (25 kg);
  • 7kg finish putty Knauf Finish;
  • 3 liters acrylic Polifarb;
  • 16 meters ceiling moldings (fillet);
  • 0.5L PVA (additive in finishku when glueing fillets).

Walls

They are plastered with clay and lime!!! Which is very unusual. But cracks in them was quite a bit, although the home more than 20 years. Since highly absorbent walls, apply the primer had to be very abundant to create a good film barrier.

instagram viewer

Picture 4.
Picture 4.

On the walls of 60 m² spent:

  • Primer - 10 liters;
  • putty start - 4 bags of 30 kg;
  • 1 finish coat bag 25 kg;
  • latex paint - bucket bucket 14 kg + 7 kg;
  • Peach Color - 3 bottles of 100g.
In a large bucket of paint poured in 2 bottles Kolor in small - 1. And paint and color from the company Polifarb.

There are still some little things, such as decorative corners and slightly pokleit wallpaper, touch up the stairs, but mostly all done. The bottom image is also disassembled timber hit the frame. picture 5 done with the entrance to the staircase from the kitchen. Bottom also see a small ceiling, on which one of the upper rooms.

Photo 5.
Photo 5.

At the bottom of the cell is a gas boiler and a bunch of pipes, generally anything interesting, so he did not show it. It seems that the tone of the painting turned out pretty soft. Harbored ability in the paint Polifarb excellent painting the ceiling in 2 layers, wall - to 1, which is great.

Evaluate material andsign upCanal.

ANDit is interesting:

"Eureka". What did it cost to replace the valve in the farmhouse
Flows tank. Eliminate two possible causes of the inlet
That's stainless steel! Rusted sink and dropped the siphon. Repair for 30 minutes
Common mistakes that you should not make the owners of peonies in spring

Common mistakes that you should not make the owners of peonies in spring

Peonies - perennial, forgiving many flaws in care. But there is a line that is better not to go i...

Read More

Bathroom to relax. So I fell in love with the green bathroom

Bathroom to relax. So I fell in love with the green bathroom

My favorite bathroom, which I picked up for a long time what it will be. When the workers, plaste...

Read More

How to find the wiring, pipes, metal frame in the wall?

How to find the wiring, pipes, metal frame in the wall?

Agree, the question often arises when there is a need for Drill to secure, for example, a TV, whe...

Read More

Instagram story viewer