Useful content

Drovennik for a bath with his hands. Installation of floor and frame

click fraud protection

IN previous section I showed how flooded pier foundation under drovennik for a bath. I turn to work with the lumber. For a long time it was not engaged.

Harness the foundation decided to do from a bar, which remained from the construction of the bath. 3 pcs. lie for several years. Spaced, sawed grooves. Mounting will be "in the leg."

Construction drovennika decided to carry out b / a timber, which remained from the construction of the bath and pouring concrete strips under the fence and on the base-plate. But for this it was necessary to clear the residual concrete planks. This has helped a Bulgarian with a wire attachment. At the same time, place to get Brushed wood surface.

Commit to the posts - on the concreted rods. Under the beams planted waterproofing - roofing material.

Laid the first two frames.

I tighten the stud in the dark. In the light of the old table lamp with an extension cord.

It turned out massively, with a margin to the load. For drovennika it too. But I did not have a sufficient number of boards 150h50 mm. Their estimated sufficient only for floors. Buy something new for this irresponsible structure does not like.

instagram viewer

Size drovennika: base 2200h1050 mm (width seven boards). Length of inclined racks - 2200 mm. According to the project drovennik - an equilateral triangle

I began to grind the board. A plane aisle seat only faces boards. He finished the grinder. Boards over the years have become crooked, deformed. They later had to scrap the installation press. The process of straightening the floor boards when mounted on the third picture.

Fixed at 150 mm nails. Screws was useless. I did at dusk. Light day becomes shorter.

Result. Get on the C grade. But all that I could - squeezed out of this b / a timber.

Further started grinding boards 150h25 mm. They were in the concrete. I grind grinder.

Incidentally, when the wire nozzle is worn and the wire length is 1 cm or less - faster process has begun. Grinding quality increased, the board became more brushed.

I mark and saw off the rack structure. But the second photo of the surface brushed boards. This larch, remained dark in it.

Establish a rack of double boards. Fixed to the metal corners with screws.

Sawed boards 150h25 mm to 1050 mm in size. I began to fasten. The first board is screwed to the vertical tilting rack level. Controlled bubble level. Then they were fixed rigidity.

The result obtained with lumber. While drovennik looks terrible. Ahead flexible installation of a roof - shingles. On this, see the next section.

At this stage of the work is spent only on the metal bracket: 4 pcs. x 4 rubles. When buying lumber (board 150h25mm - 3m) in 2017, I paid about 2 thousand. rub. Priplyusuem them to the cost of the foundation (500 rubles).

But they have participated in different work as formwork. Because have been in the concrete, it does not get wet and is not deformed. In fact, I have not spent drovennik these funds - they have long been taken into account.

Continued: Drovennik for a bath with his hands. Installation of flexible roof

***

photos of the author (s)

Subscribe per channel, introducing it in the browser bookmarks. There is a lot of interesting information.

A beautiful garden: a spectacular decor for next to nothing

A beautiful garden: a spectacular decor for next to nothing

An interesting solution for the decoration of walls and fencesBoring deaf fences, built to wall o...

Read More

Putting up to 15 kg. potatoes with 1 sq. m: method Kvartalnova

Putting up to 15 kg. potatoes with 1 sq. m: method Kvartalnova

From the edge of the site is necessary to pull back 40 cm and dig the groove. It must turn out to...

Read More

Blossoms king peas - it's time to feed, to tasty pods were more

Blossoms king peas - it's time to feed, to tasty pods were more

Hello, growers! How's the weather in your area? We exhausting heat retreated, but were replaced a...

Read More

Instagram story viewer