Construction bath. Self-assembly and thermal insulation of floors
Came the construction season of 2011. But because of the regular difficulties with finances, activity declined in construction. There were months when even was not possible to purchase the necessary materials. I started to work only in June. So, what has been done in the first place?
Acquired azure for a tree - covered facade baths. purchase TM Senezh, Marigold color, 2.5L - 3 pcs. Water azure economy class. I bought just such as the most common and cheap in our city at the time. I do not recommend for outdoor aquatic blue due to the fact that the coating on the tree is not kept, washed away by rain. They are best used only in the interior design where necessary environmental friendliness. A year later, I had to get another blue (washed off the coating and color became dull). He has already acquired another TM, alkyd based.
Elektrorubanok repaired because after work on prostrugivaniyu timber - worn belt.
Next, work began on the installation of the sub-floor. Nailed to the bottom bar of the beams and was putting them sawn into boards 150h25mm size:
Unfortunately, the pictures in 2011. I did not do, or they did not survive me. So I will give the approximate photos from the Internet. Subfloor looked at me like this:
Warming planned floor and ceiling slabs ecowool. I chose this material because of the fact that it does not live by the reviews of the mouse. In the mineral wool and packaging to infest Minplita mineral wool or inconvenient to carry. The car will only 2-3 package. While I needed volume ecowool I moved just twice in his car. She then sold in simple polypropylene bags. But the process of warming below.
Next went to work on the filing of rough ceiling. I did the same from edging boards 150h25mm:
Subsequently, finishing the ceiling planned upholster Lining
I decided to make the door. Nothing complicated about it is not seen. Acquire the purchase did not want to. I bought floor board 27h100h3000 - 8 pcs. and bar the door, 3m - 2 pcs. He mounted door leaf and pulled it through the planed bar screws:
Later, on the outside (where the bars are), I obbil Lining fabric remnants. Delov an hour and many times cheaper than the finished door. Then a similar case and with the installation of other doors in the bath (in the washing and steam room). Hand stuffed, turned out better.
Drank "edge" in the wooden house to guide and set the box on the door guides. The guides made of boards and bars 150h50mm 50h50mm. need for what would have warped the door of shrinkage of the framework.
I bought ecowool in bags. At first 5 bags - for what would have to evaluate what it will take up the volume at the free sifting (not when blowing - as recommended). Then he bought another 11 bags. It was enough to floor and ceiling. Before that bought a vapor barrier In Izospan1 roll 70 sq.m. Stela it on the rough floor with the only purpose of that would not wake up in the gap ecowool. Well, for what would be the pie "breathe."
Floor area I: approximately 4h4m. The area of the ceiling: 4h6m. Of the estimated volume of the leaves on the amount of floor beams and the height of the sub-floor. Total insulation thickness obtained by: floor - 75 mm (plus 25 mm board) ceiling - 150mm (plus board, plus lining).
Loosens ecowool hammer drill mode with a nozzle for mixing of tile adhesive in the box. Then he moved the box to the site and poured with leveling. Although one could not loosen.
It looked something like this:
Later purchased an additional vapor barrier Izospan roll in to close ecowool the attic dust accumulation and random garbage.
Drank from the pediment of the attic and made this part of the attic door.
further acquired floor boards (jointed) 0,033h0,130h4 - 40pcs. and Lining 0,015h0,180h4 size - 120 pcs. Jointed Batten was acquired from the criterion of a minimum length of scraps after its installation. Other options not found in the midst of the construction season. But such a narrow wagon caught, too, only that size. It is this found in the size of sales allow cover the entire area of the room that would be missing the seam on the ceiling. Those. Lining overlaps the entire width of the bath.
Brought in advance together with an edging board 150h25mm. Shipping cost in the amount of time 2300r. (450r. x 2h - loading / unloading, and 14 rubles / km)..
Costs at the end of the summer of 2011 .:
Next ordered windows. I chose wood with glass. Order placed on a small garage manufacturing ad. About this in the next article ...
***
Read more: Bath samostroyschika. Mounting furnace chimney effect
Read from the beginning: Why I decided to build a house?
Subscribe per channel, introducing it in the browser bookmarks. There is a lot of information.