Sochi luxury, or how not to splurge on communications (construction of a house of 85 square meters)
The story about the construction of his house to share with us Anastasia from the city Sochi.
Repair is not easy, but building a home with a limited budget is almost unreal. Until 2018, I thought so. My name is Anastasia, I and my husband and son live in the city of Sochi. Until July 2019 she lived with her mother in law, but in the summer moved into his home, dream home.
Selection of dreams
Bought land, money for a house have had little, in general, we have a mortgage and bought a house for 619,000, 85 squares.
The first floor is a laminated board, a width of 12mm, the second floor frame.
The wooden house is good that packed it for 2 weeks, but inside seemed to make repairs, wood looks very worthy, but of course this is not enough for permanent residence.
But it would be desirable to focus on how we prepare it for the move, particularly with regard to communications.
Water is expensive
The first of that we decided to take this water. Since the property is located in a partnership with a delicious name SNT Peach, of course there is almost a municipal water connection but it costs us 150,000, it was expensive. It was decided to drill the water, the more all the neighbors and make drilling with submersible pump cost us 120,000 of them in the work itself at 100,000, 20,000 and all pump components to it. Water is at a depth of only 40 meters, hence the price.
The well was the year we enjoyed it just because the hose now water in the house and hot and cold, but the truth through the filter 2, as it silts up strongly.
Of course to stay a little water and we had light.
Let there be light
Ltd. "Kubanenergo" is not an organization, but something. Not only that queue, so there's nothing to explain, it was necessary to seek all the answers through the chiefs.
The light in our partnership is also there, but also its connection would cost us 120,000, as opposed to law that everyone can count on the light at any point in the city, provided that a line of his own score. This law, and we took advantage of.
- Line - 30.000r (installation of pillars and a concrete base)
- Wires - 20,000 (to broach the whole line from the main column to the house)
- The work of electricians - 0P. (Did relatives)
- Corrugation and wires in the house - 10.000
- Machines and RCD, as well as block them - 4,000 (machines were friends)
- The fee for the light itself - 550, for connection.
Total 30t. + 20t. + 10t. 4t +. + 550 = 64.550r.
Now the lights in the house, we are never in it did not pay, but for non-permanent use of 2 years we came 3.750r cheaper than an apartment.
Generally it is now October and we are still here, Sochi autumn.
Topimsya electric batteries, but in Sochi weather pleases on the street 19, so I think not freeze. This will be our first winter in the house.
To be continued...
p.s .:My HouseHe is trying to give you the most important, useful, interesting information.Subscribeon the channel - is still to come!
#my house renovation of a country house