Water from the well house
The task: arrangement of individual water supply system from the well.
Progress of works: Everything for the water supply system was first dug a well. The depth of the wells turned out about 25 m (Klin region, MO), and the flow rate is not very big. Standing water level was about two rings and at full pumping filling occurred within 5-6 hours:
Given the high production rate of the well is not, for the implementation of the water supply system, next to the dug wells were It decided to add an extra 3-hkubovuyu buffer tank with automatic filling and control system level:
After mounting the buffer tank to the well and capacity were summed up water pipe:
Due to the great depth of the well and to provide ease of maintenance of pipes, placed well inside the metal service platform was equipped with mounted on chains:
After the outer rail has been completed, the pump was configured assembling station in which water from the buffer tank and the installation of piping and boiler provides hot water supply:
More detailed information on progress of the works can be found in our photo gallery. Total time arrangement of water supply systems of the house from the well was 2 months.