Reliability for: arrangement of strip foundation under the fence
Why do we pour the foundation for the fence? - you ask. And we answer: pour the foundation for a fence is necessary in order to increase its service life, as well as to prevent the penetration of the land of unwanted persons and animals.
Sequencing
First of all, you need to use long poles and twine to mark the perimeter of the future construction and formwork.
When the formwork outline ready, you need to remove the soil.
Where will be the pillars of the pit depth should be 80 cm. The spans of the fence - 40-50 cm.
The next step - setting and concreting of the pillars. Note: The minimum hole diameter column - 150mm. A thinner layer of concrete is hardly keep pillar, and will lead from the wind load and contact with the moist soil in the spring.
Important! After Prokopka trench to the bottom you will need to fill sand and gravel - a cushion that protects the concrete from moisture in the ground.
Formwork easy to perform from wooden planks (and if you wrap the foil them, you can re-use) or old plywood or chipboard panels.
After installing the casing into the cavity of the valve stack - it will give the future a concrete fortress construction.
The very last stage - in concrete formwork.
: