How to Replace a report or tile flush old
I case the situation when it was necessary or replace damaged tiles or report to a new level the old.
The problem is complicated by the fact that in one case tilers aligned wall solution, and the distance to the main wall was decent. And in the second, dismantled to replace a broken tile floor appeared with a decent chunk of concrete.
Work like a small, but tedious and meticulous, as it is necessary to go on a par with the already laid tile. And it occurred to me that it is possible set stops, which will record a new tile with an already installed in the same plane.
Method easy, it is necessary to place the tile laying Drill four dowel and set in them screws and adjust them so that they support the tiles flush old.
In this case, tile has nowhere Zagulyaev and contracting while drying the solution will withdraw it. Naturally, more you need to install the crosses or wedges, which will ensure the evenness of the weld.
video description
Subscribe and we have more than once Let us examine the situations that arise during the repair time. Your home renovation.