Plot Layout and final costs for the foundation
The final scope of work in the 2018 season. was layout area around the foundation. The plot is not completely horizontal and has a small slope "north-south" and "east-west". Therefore, after the slab casting, the two sides around the blind area was black earth, rising to 10-20 cm.
Called the previously proven in ground BobCat works. Land with the two sides had been rolled truck mixer. Tractor had not so easy to perform excavation.
Black soil immediately in the ladle transported into the lower part of the plot:
Spring 2019 Photo. In the fall of 2018. this place is not photographed. Here clumps of black earth after winter has partially crumbled. In May, a tractor with a cutter that will plow the land for potatoes, vspashet that made this place. Or I leveled shovel - because black soil became loose.
What happened around the basement:
At a distance of 3 m was formed "step" from both sides. BobCat angle could not cut it. The driver said he did not give it to him to do the tractor electronics. Or maybe just did not want to, because it was obvious that the tractor was given this job is not easy.
In the autumn of flattened "step" shovel. But the black soil was very tight. I resisted with difficulty.
I leave it until spring. In the spring, after frost heaving soil became looser and finish the work has become easier:
Equipment will arrive during construction - soil compacted and drop on the south side will be quite noticeable.
The bath did things which did not reach the hands of a few years - overlaid brickwork. Photos of "before" and "after":
Lecturing large pebbles on the tile adhesive - manually each stone as a mosaic. By the time taken for three nights. For a long time, because I had to choose a flat gravel.
Feature during installation - tile adhesive should be very thick. If it is too plastic, flow, then all the work "float" under its own weight. The thickness of the adhesive layer - 0.5-0.7 cm.
Someone has already started to ask, at what price cost me slab foundation. Here is the final screen shot:
If you do not take into account the cost of gasoline, spent a season and the cost of greenhouse-workshop, as well as a number of purchases that are not related to the production process base, the base-plate height of 45 cm (with a concrete strip on its top), a front decorative surface and a blind area, came at a cost of slightly more than 200 thousand. rub. (I checked by adding the basic costs of the file). Slightly more expensive strip foundation, but without the decorative coating.
Neighbor under the wooden house comparable area flooded strip foundation. His concrete volume - 33 m3. I - 26 m3. Yes, its foundation above. But it must still make floors and insulate them. This is a big plus to the cost.
Any strip foundations to do floors: wooden logs with insulation or backfill and floors on the ground. These works can significantly add to the cost of ribbon. But they are few who think comparing the cost-slab foundation and tape.
If you did everything brigade, then the sum of the value of my foundation, you can add at least 150 thousand. But on the decorative surface of the base and the vertical blind area would not have to speak. Even if they possessed this technology, the beauty of this, of course, also have a fee.